TAG

#investment

5 articles
The construction site of a building going up: reinforced-concrete foundations and wooden formwork, with apartment blocks in the background, at Ungheni's “Vasile Alecsandri” high school.
EDUCATION & HEALTH

Ungheni's “Vasile Alecsandri” high school builds its first gym: 13.7 million lei for the first stage alone

The oldest high school in Ungheni district, whose roughly 620 students have had no indoor gym until now, finally has a construction site. The state procurement registry shows a 13.72-million-lei contract for the building's structure, won by COLASS SA. The walls go up this year, the interior follows in 2027 — and the total cost will be higher, because the second stage is not yet budgeted.

Ion Calmis·8 July 2026· News
A sports court under construction: blue and red rubber tiles laid over a gravel layer, two workers and a project board with the Ungheni District Council logo, a building in the background.
LOCAL

At Ungheni's former boarding school, pickleball and badminton courts are taking shape — after €50,000 from Maramureș

Ungheni District Council is building a sports facility in the yard of the town's former boarding school, at the Educational Centre. After the mini-football pitch built in 2024 with €50,000 from the Maramureș County Council — now used in the 'Prietenia' summer camp — badminton and pickleball courts are 'in the final stretch.' A construction-site board indicates a value of about 1.77 million lei for this stage.

Ion Calmis·25 June 2026· News
2/3 confirmed · DATA — pending· got a tip? write to us →
A Centru Development Agency representative in a hi-vis vest studies plans with two men at a construction site; behind them, the metal frames of the new Ungheni market’s pavilions.
PUBLIC SERVICES

ADR Centru checked three sites in Ungheni: the market, the French Park and a 35-million-lei road to Plaiul Fagului

The Centru Regional Development Agency — the body through which the state spends money from the National Fund for Regional and Local Development — inspected three building sites in Ungheni district on 18 June. Alongside the already-known agri-food market and French Park, a third project surfaced: rebuilding the access road to the “Plaiul Fagului” reserve, worth about 35 million lei. Together it is tens of millions in public money — which the official statement no longer puts into figures.

Ion Calmis·18 June 2026· News
2/3 confirmed · PEOPLE — pending· got a tip? write to us →
Two workers assemble the formwork of a water-retention basin on the building site of the French Park in Ungheni; in the background, trees and machinery.
PUBLIC SERVICES

The French Park in Ungheni is changing its face: skatepark, padel and 5,217 m² of sports grounds on the bank of the Prut

The largest green space in the Ungheni municipality is a full building site. Besides the underground networks, the parkour zone, the skatepark and the water-retention basins are already taking shape, and on about 4 hectares there will be sports grounds — including for padel — playgrounds, cycling paths and running tracks. The money comes from two projects, one European and one national, and the healthy trees stay in place: the park was scanned by drone before the works.

Ion Calmis·17 June 2026· News