TAG

#bani publici

4 articles
Two officials stand on the concrete slab of a new culvert at a road worksite; behind them, a freshly poured concrete wall, excavated earth and the old gravel road climbing among the trees.
PUBLIC SERVICES

35 million lei for the road to Plaiul Fagului: what is changing in Rădenii Vechi

Ungheni district president Dionisie Ternovschi and the district council's head of construction, Diana Rogovschi, filmed the state of the works on 10 July on the access road to the „Plaiul Fagului” reserve, in the village of Rădenii Vechi. The roughly 35-million-lei worksite has reached the culverts and drainage stage; the gravel road is getting a new foundation, concrete gutters and almost two kilometres of pavement. Placing the site footage next to the procurement document shows how much it costs, who is building it and what the project actually involves.

Ion Calmis·10 July 2026· News
Illustration: a bright, freshly renovated classroom in a village school.
EDUCATION & HEALTH

Half a million lei for a village school: the state repairs the Boghenii Noi gymnasium

The Ministry of Education and Research will invest 500,000 lei in the „Anatol Popovici” gymnasium in Boghenii Noi for repair works this summer, the Ungheni District Council announced. It is state money going straight into a rural school in the Culei area — a concrete figure and a clear funder, which is usually missing from announcements about repairs in educational institutions. What exactly the sum covers was not detailed.

Ion Calmis·3 July 2026· News
1/3 · reporting underway· got a tip? write to us →
A renovated kindergarten kitchen: walls lined with light tiles, an industrial extractor hood with a metal duct hanging from the ceiling, a four-burner stove, kitchen furniture and a sink beside a frosted-glass door.
EDUCATION & HEALTH

Kitchen of the „Poienița” kindergarten in Cornești rebuilt from scratch: tiles, professional ventilation and a new stove for children's meals

The Cornești town hall announced on 3 July that renovation of the food block — the kitchen where children's meals are cooked every day — at the „Poienița” kindergarten is complete. Official photos show a room lined with tiles, an industrial extractor hood and ducting, a four-burner stove, and new furniture and sinks. The announcement does not say how much the work cost or who paid for it, and the Register of Local Acts contains no town-council decision explicitly dedicated to this project.

Ion Calmis·3 July 2026· News
2/3 confirmed · PEOPLE — pending· got a tip? write to us →
Rows of metal frames of the future pavilions on a paved plaza, with a pallet of paving stones in the foreground and a truck, at the construction site of Ungheni's new agri-food market.
LOCAL

Ungheni builds a 17.5-million-lei agri-food market, with completion pushed to autumn

Ungheni City Hall shows a construction site that is moving ahead. The public record, however, says more: a market worth over 17.5 million lei, with its deadline pushed to autumn, funding shifted from a European programme to national money, and open questions about some 80 traders and about the site's transparency.

Ion Calmis·16 June 2026· Analysis
2/3 confirmed · PEOPLE — searching· got a tip? write to us →